Overview
- Cryogenic Solution VII is a tier 7 supply consumable which can be developed from an r&d plan.
Assembly Plan
- 3 Exo-Material
- 1 Battery Fragments
- 1 Catalytic Solution
- Building a Cryogenic Solution VII at an r&d station will result in a stack of 88 consumables.
Obtained from
Related article links (1)
R&D StationTrivia
- The item can be developed from Plans: Cryogenic Solution VII.
